威尼斯人app

威尼斯人app首页—Integrated Engineering and Technology Provider of Oil & Gas Storage and Transportation. English Chinese Subsidiary Bter Official WeChat

Scan QR code to pay attention to our 威尼斯人app首页 and share constructive industry observation, News and technological information!

威尼斯人app首页

Home >> Projects >> Cases

A+ | Reset | A-

CASES

Onshore gas export pipeline

The gas export main line starts from Atuabo Initial Station (AIS), which is combined with Gas Process Plant (GPP) located at northeast Atuabo, terminates at the northwest Takoradi Thermal Power Plant (TTPP).The main pipeline is approximately 110.9 km with 20" outside diameter; gas pipeline transmission system consists of a Atuabo Initial Station (AIS), a gas distribution station (EDS), a terminal station (TRMS) and 2 sets of block valve stations.

The gas export branch line starts from gas distribution station (EDS) located at Essiama, terminates at Prestea Regulating and Metering Station (PRMS) at Prestea. The branch is approximately 95 km and 20" outside diameter with 2 sets of block valve stations along the pipeline.


NO. Project Title Product name Pressure level Number of suppliers Annual operation
1 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Pressure Regulating Skid 8MPa 2sets 2012
2 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Self-used Gas Skid 8MPa 1set 2012
3 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Ultrasonic Metering Skid 8MPa 2sets 2012
威尼斯人app首页
  • Cases
  • 威尼斯人app首页 worldwide

专业顾问

威尼斯人app首页 Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 威尼斯人app首页
老虎機遊戲-澳門老虎機 ->
澳門賭場 ->
澳门线上体育|澳门体育赌博十大平台 ->
新葡京app ->
世界杯网站登录 皇冠走地世界杯盘官方网站官网 世界杯买球App网址大全 世界杯体育正规网址 世界杯下注网站app