CASES

The gas pipeline, one of the four large infrastructure projects in China's 10th Five-Year Plan (2001-05), will transport clean fuel from Xinjiang to the energy-hungry Yangtze River Delta. The pipeline is constructed and owned by Petro China Co.

The entire pipeline has been completed in September 2004, and has commenced commercial service at the end of 2004.


The 4,000 kilometers (2,500 mi) long pipeline runs from Lunnan in Xinjiang to Shanghai. The pipeline passes through 66 cities in the 10 provinces in China. Natural gas transported by the pipeline is used for electricity production in the Yangtze River Delta area. There is a plan to replace coal with gas in Shanghai by 2010. The capacity of the pipeline is 12 billion cubic meters (420 billion cubic feet) of natural gas annually. By the end of 2007, the capacity was planned to be upgraded to 17 billion cubic meters (600 billion cubic feet). For this purpose, ten new gas compressor stations will be built and eight existing stations are to be upgraded.


The West–East Gas Pipeline is connected to the Shaan-Jing pipeline by three branch pipelines.The 886 kilometers (551 mi) long Ji-Ning branch between the Qing Shan Distributing Station and the Anping Distributing Station became operational on 30 December 2005.


The pipeline is supplied from the Tarim Basin gas fields in Xinjiang province. The Changqing gas area in Shaanxi province is a secondary gas source. In the future, the planned Kazakhstan-China gas pipeline will be connected to the West–East Gas Pipeline.


Starting from 15 September 2009, the pipeline is also supplied with coalbed methane from the Qinshui Basin in Shanxi.


KongQueHe Compressor Fuel Gas Metering and Regulating System of West-East Gas Pipeline
Self-Used Gas Metering and Regulating System of West-East Gas Pipeline
Pressure Regulating System of West-East Gas Pipeline Qingshan Station
Ultrasonic Metering System of West-East Gas Pipeline Xuedian Station
Turbine Metering System of West-East Gas Pipeline Shanghai Station
Insulation Project of West-East Gas Pipeline Xinjiang Sidaoban Compressor Station
NO. Project Title Product name Pressure level Number of suppliers Annual operation
1 West-East Gas Pipeline Heating and Insulation Project 8stations 2005
2 West-East Gas Pipeline Self-Used Gas Metering and Regulating System in Station ANSI600 20sets 2005-2006
3 West-East Gas Pipeline Jintan Gas Storage Self-Used Gas Metering and Regulating System in Station ANSI600 1set 2006
4 West-East Gas Pipeline Huaiwu Branch Pressure Regulating System ANSI600 8sets 2006
5 West-East Gas Pipeline Jintan Gas Storage Pressure Regulating System ANSI600 15sets 2006-2007
6 West-East Gas Pipeline Flow Increase Project Compressor Fuel Gas Metering and Regulating System ANSI600 9sets 2006-2007
7 West-East Gas Pipeline Flow Increase Project Self-Used Gas Metering and Regulating System in Station ANSI600 10sets 2006-2007
8 West-East Gas Pipeline Flow Increase Project Pressure Regulating System ANSI600 12sets 2006-2008
9 West-East Gas Pipeline Flow Increase Project Ultrasonic Metering System ANSI600 2sets 2007
10 West-East Gas Pipeline Flow Increase Project Turbine Metering System ANSI600 12sets 2007-2008
11 West-East Gas Pipeline Qinshui Coal-bed Gas Project Pressure Regulating System ANSI600 2sets 2008
12 West-East Gas Pipeline Qinshui Coal-bed Gas Project Ultrasonic Metering System ANSI600 2sets 2008
13 West-East Gas Pipeline Lunnan Station Compressor Fuel Gas Metering and Regulating System ANSI600 1set 2009
14 West-East Gas Pipeline Qingshan Station Ultrasonic Metering System ANSI600 2sets 2010
15 The First Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Pressure Regulating System ANSI600 4sets 2010
16 The First Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Ultrasonic Metering System ANSI600 2sets 2010
17 The Second and Third Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Ultrasonic Metering System ANSI600 1set 2010
18 The Second and Third Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Turbine Metering System ANSI600 2sets 2010
19 West-East Gas Pipeline Huaiyang Station Pressure Regulating Skid ANSI600 1set 2010
20 West-East Gas Pipeline Zhengzhou Station Pressure Regulating Skid ANSI600 1set 2010
21 West-East Gas Pipeline Zhengzhou Station Ultrasonic Metering System ANSI600 1set 2010
22 The First Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Turbine Metering System ANSI600 1set 2010
23 The First Phase of Jiangdu-Rudong Branch of West-East Gas Pipeline Self-Used Gas Metering and Regulating System in Station ANSI600 1set 2010
24 2011 Station Reconstruction and Expansion Project Metering and Regulating System ANSI600 9stations 2011
25 Self-Used Gas Metering and Regulating System in Station Pressure Regulating System ANSI600 9 stations 2011
26 2011 Station Reconstruction and Expansion Project Self-Used Gas Metering and Regulating System in Station ANSI600 1set 2011
27 2011 Station Reconstruction and Expansion Project Pressure Regulating Unit 0.4MPa 3sets 2011
28 2011 Station Reconstruction and Expansion Project Flow Computer ANSI600 2sets 2011
29 2012 Station Reconstruction and Expansion Project(Jining Station) Metering and Regulating System 1set 2012
30 Zhenjiang Distribution Station of 2013 Station Reconstruction and Expansion Project Ultrasonic Metering Skid ANSI600 1set 2013
31 Nanjing Distribution Station of 2013 Station Reconstruction and Expansion Project Ultrasonic Metering Skid ANSI600 1set 2013
32 Lushan Distribution Station of 2013 Station Reconstruction and Expansion Project Ultrasonic Metering System ANSI600 1set 2013
威尼斯人app首页
  • Cases
  • 威尼斯人app最新 worldwide

专业顾问

威尼斯人app Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 威尼斯人app最新
老虎機遊戲-澳門老虎機 ->
澳門賭場 ->
澳门线上体育|澳门体育赌博十大平台 ->
新葡京app ->
世界杯赌博正版 世界杯在线信誉 世界杯下注网站登录网址 真钱世界杯买登录 世界杯押注软即送