Onshore gas export pipeline

The gas export main line starts from Atuabo Initial Station (AIS), which is combined with Gas Process Plant (GPP) located at northeast Atuabo, terminates at the northwest Takoradi Thermal Power Plant (TTPP).The main pipeline is approximately 110.9 km with 20" outside diameter; gas pipeline transmission system consists of a Atuabo Initial Station (AIS), a gas distribution station (EDS), a terminal station (TRMS) and 2 sets of block valve stations.

The gas export branch line starts from gas distribution station (EDS) located at Essiama, terminates at Prestea Regulating and Metering Station (PRMS) at Prestea. The branch is approximately 95 km and 20" outside diameter with 2 sets of block valve stations along the pipeline.


NO. Project Title Product name Pressure level Number of suppliers Annual operation
1 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Pressure Regulating Skid 8MPa 2sets 2012
2 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Self-used Gas Skid 8MPa 1set 2012
3 Ghana Early Phase Gas Infrastructure Project-- Onshore gas export pipeline Ultrasonic Metering Skid 8MPa 2sets 2012
威尼斯人app首页
  • Cases
  • 威尼斯人app最新 worldwide

专业顾问

威尼斯人app Tel:+86 22 22193891/92/93
Fax:+86 22 22193895
Add:No.18 Fuyuan Road, Jingbin Industrial Park, Wuqing District, Tianjin, China
Zip code:301712
Website:www.petrobest.com
Copyright © 2015-2016 威尼斯人app最新